Salboy is developing a 41-storey building on Great Bridgewater Street with 362 apartments, set to complete in 2024. The project incorporates Grade II-listed Victorian arches.
Residential
Salboy and Relentless Circa are developing a 47-storey building on Jackson Street, Manchester, featuring 206 apartments and 170 hotel rooms, with the first W Hotel set to open in 2027.
Commercial
Residential
Salboy’s Manchester development includes 556 units across five buildings, with the tallest at 26 storeys. Located on the former Boddingtons Brewery site, it’s set to finish by 2026.
Residential
Viadux Phase 2 in Manchester, by Salboy, will feature a 160-bed 5-star hotel and 452 luxury residences across 76 floors. Set for completion in 2031, it will offer a bar, restaurant, gym, spa, and event spaces.
Commercial
Residential
Cluny Mews, a luxury development by Salboy in Earl's Court, offers 35 high-quality apartments, including 8 duplex penthouses. Completed in 76 weeks, the project was finished in March 2023.
Residential
Obsidian, a Salboy and DOMIS project on Trinity Way, Salford, will offer 250 homes across 25 floors, with amenities like a gym, cinema, and restaurant. Completion is set for Q2 2026.
Residential
Salboy completed an 18-floor office building in Manchester in 2023, featuring a restored historic façade and modern office spaces, with excellent tram links in the Northern Quarter.
Commercial
We worked with Footasylum to refresh stores in Birmingham, Huddersfield, Manchester, Liverpool, Broughton, Bury, and Brighton.
Retail
Heath Lodge in Clacton-on-Sea features six mid-range dwellings set for completion by the end of 2024. Located near the seafront, some plots include double garages for added convenience.
Fund Monitoring
The Lidl store at Montrose Retail Park, Liverpool, developed for the Derwent Group, was completed in 2021 with full Employers Agent and Quantity Surveying services.
Retail
The Montrose Business Park project for Derwent Group involved building a Lidl and Starbucks on Edge Lane, Liverpool. Artal provided project services from 2019 to 2021.
Retail
The McDonald's at Bidston Moss Retail Park, completed in 2023 for Derwent Group, involved shell and core construction and Project Monitoring Services from RIBA Stage 3-5.
Retail
The Aldi store at Wigan Glasshouse Retail Park, developed for the Derwent Group, is awaiting planning consent (May 2024) with shell and core construction and Employers Agent services.
Retail
Didsbury Point, by City Branch Limited for Southway Housing Trust, includes 76 apartments, a medical centre, a two-tier car park, and landscaping. Services started in 2023, with completion in2025. Artal provides project management and consultancy services.
Retail
The Walkden Town Centre redevelopment for Derwent Group includes new retail and dining spaces, a shopping boulevard, and future development plots. Artal provided services from 2021 to 2026.
Retail
The Starbucks at Montrose Retail Park, Liverpool, completed in 2021 for Derwent Group, involved shell and core construction and Employers Agent services.
Retail
The Costa Coffee at Wigan Glasshouse Retail Park, developed for the Derwent Group, is awaiting planning consent (May 2024) and will include shell and core construction with Employers Agent services.
Retail
Bagby Hall in Thirsk features five mid to high-quality dwellings set for completion in 2024. Utilising concrete bricks and air source heat pumps, this development offers modern comfort in the heart of the village, making it an appealing choice for new homeowners.
Fund Monitoring
Sevenstore in Liverpool’s Baltic Triangle, opened in May 2019, blends high-end fashion with technology in a minimalist space, also hosting events and art exhibits. We provided project management and cost consultancy for the development.
Retail
Located in Coverack, this 12-month project includes four high-specification dwellings by the sea, featuring Cornish handmade walls and stunning ocean views.
Fund Monitoring
Located in Ancoats, Manchester, this 12-storey building with 144 apartments will be completed in 117 weeks, featuring a brick façade and priority sales for healthcare workers.
Fund Monitoring
Located in London, this project includes nine dwellings with a £2 million budget and a 55-week completion timeline.
Fund Monitoring
Located in Stogursey, this development includes five steel frame dwellings, expected to be completed in approximately 52 weeks. Residents will enjoy views of Stogursey Castle, with some units featuring double garages for added convenience.
Fund Monitoring
Tenford Lane in Stoke-on-Trent features 40 mid to high-spec dwellings, set for completion in May 2025, offering quality living spaces designed for modern homeowners.
Fund Monitoring
Salboy and Forshaw Group have completed a 25-storey development in Manchester, featuring 177 apartments and finalised in 2024 after 2.5 years of construction. The building is conveniently located within walking distance of Piccadilly and near the Co-op Arena, offering modern urban living.
Residential
The Fleetwood Fish Park project created 42,000ft² of fish processing units, with specialised facilities. Services ran from 2019 to 2021, with £2.6 million in DEFRA funding secured to support the local fish industry’s future.
Industrial
The Caton Road project for the Derwent Group includes six industrial and distribution buildings (108,000ft²) with access, landscaping, and boundary works. Services began in 2020, with construction yet to start.
Industrial
Forshaw Construction will begin a 25-storey project at Cornbrook Road and Dinton Street, Manchester, in 2025. It includes 237 apartments, 71 hotel rooms, two cafés, co-working spaces, and 120 cycle stands and more.
Commercial
Residential
Forshaw Construction completed a 17-storey, 160-apartment building on Derwent Street, Manchester, with a hand-laid brick façade in 2024.
Residential
Salboy's Salford project features three blocks of 399 apartments, completed in 2020, directly opposite the Salford University campus.
Residential
Salboy is set to develop three buildings in Newquay, featuring 61 units in Block A across five floors. Planned for 2028, the site will offer stunning sea views above Tolcarne Beach.
Residential
Oxid House, located in Manchester’s Factory Estates, features 119 apartments across 12 floors. Completedin 2018, its silver facade ages into a unique rust copper hue, offering modern living in a prime location.
Residential
Salboy developed an 18-storey building in Salford with 219 apartments, completed in 2022. The project features amenities like a gym, yoga studio, and cinema, is located close to Manchester City Centre.
Residential
Residenza in Manchester’s Brookfinch area offers 14 luxury townhouses with two-car garages, private gardens, and balconies. Completed in 2017, these homes provide a rare combination of space and luxuryi n the city centre.
Residential
Salboy completed a 10-storey building with 183 apartments in Manchester, Northern Quarter in 2020, on the site of The Tib Street Horn, enhancing the area with modern living options and access to amenities.
Residential
Westbrook Villas in Chorlton, Manchester, offers 12 luxury homes, including 8 new builds and 4 behind a historic Masonic lodge façade, completed in 2021.
Residential
Salboy converted an existing building in Manchester into 66 apartments, completing the project in 2020after two years of development. This transformation revitalised the site of a former cooperative printing press.
Residential
Stoneyhurst in Clitheroe, Lancashire, is a development of 31 luxury homes by Hillcrest Homes, completed in 2020. The traditional stone-built houses offer modern living in a charming countryside setting.
Residential
Trident in Sale, Manchester, is an office-to-residential conversion completed in 2020. The project added anew penthouse floor on top of the original 8 floors, creating modern living spaces within the Factory Estates development.
Residential
Nikal's 27-floor building in Birmingham, completed in 2019, features 604 apartments and ground-floor amenities from Greggs and Co-op. Located opposite the new Birmingham Curzon HS2 terminal, it offers convenient urban living with excellent transport links.
Residential
Huyton Trade Park for Derwent Group replaces old units with 24 new industrial units (62,500ft²). Services span RIBA Stages0–6 (2021–2025).
Industrial
The Wigan Glasshouse project replaces four vacant offices with eight industrial units (115,900ft²) and supporting infrastructure. Services began in 2020, with construction pending.
Industrial
Salboy's Salford development on the former Manchester racecourse site includes 367 houses, commercial space, and award-winning public open space, completed in October 2024.
Commercial
Residential